Reliable, Clean, Power On Demand.
Reliable, Clean, Power On Demand.

10 Megawatts of Reliable, Clean Gas Turbine Generating Capacity Available Now!

FlexEnergy’s expanded manufacturing capacity and improved fleet management have opened limited availability for Flex Turbine® units. Qualified projects can move toward deployment now instead of waiting through extended industry lead times.

A Limited Window to Deploy
Gas Turbine Power Faster

Across the industry, gas turbine wait times now stretch into years. FlexEnergy Solutions has opened a limited capacity for qualified projects to access Flex Turbine generating capacity sooner, helping teams move forward now instead of waiting for future production slots.

How soon can I secure a Flex Turbine?
Flex Turbine units are available now for immediate deployment supporting qualified projects from 250 kW to 2 MW — limited availability that will close as units are claimed by new orders.

What this means for you:

Faster access to gas turbine
power generation

Accelerated project timelines

The ability to move forward while
others wait

This window is temporary. Once available units are committed to new orders,
delivery schedules will extend and lead times will rise again.

Built for Projects That Can’t Wait

Flex Turbine® gas microturbine gensets are built for:

  • Oilfield electrification for production pads and well sites
  • Midstream facility power
  • Combined Heat & Power (CHP) / Cogeneration Systems
  • Precision manufacturing
  • Data center prime power

Best Fit Projects

FlexEnergy currently has 10 MW of total generating capacity available, made up of Flex Turbine® units ranging from 250 kW to 2 MW. To maximize production efficiency, we’re prioritizing:

  • Power generation needs ranging from 250 kW to 2 MW
  • Mission-critical applications demanding ultra-high uptime
  • Emissions-sensitive projects staying below major-source thresholds (avoiding Title V permitting)
  • Time-sensitive projects requiring accelerated delivery
FlexEnergy Flex Turbine gas turbine generators on a production site

Built for Reliability and Performance

Ultra-High Uptime

The Flex Turbine fleet has demonstrated 99+% mechanical availability, backed by over 4 million runtime hours

Emissions Leadership

Flex Turbines deliver ultra-low emissions, typically lower than the local utility grid

Fuel Flexibility

Wide fuel tolerance provides fuel flexibility (well gas, flare gas, sour gas)

Modular, Scalable

Our Flex Grid microgrids can scale from 200kW to ~10 megawatts as needed

CARB Compliant

The Flex Turbine is certified by the California Air Resources Board (CARB) for installation and use in California

Most Projects Wait on Gas Turbines.
Yours Doesn’t Have To.

In today’s market:

  • Projects are delayed by material lead times
  • Construction schedules slip due to supply constraints
  • Capital sits idle waiting on infrastructure

With this opportunity:

  • Deploy reliable, clean power sooner
  • Start installation faster
  • Bring facilities online — and start generating revenue — earlier

Capacity Is Limited — And It Will Fill

This production window exists because improved fleet management freed up underutilized assets and we just completed our production line expansion.

When these units are deployed and incoming orders are scheduled…

Capacity will tighten again

Production schedules will extend

Lead times will increase

This is a short-term opportunity, not a permanent change.

Find Out If Your Project Qualifies
for Immediate Availability

Tell us your project size, application, and timeline and we will confirm whether your project qualifies for fast-track deployment.

Name(Required)

Proven Performance. New Opportunity.

FlexEnergy Solutions delivers reliable, clean turbine generated power for:

Oil & Gas production
Midstream facility power
Precision manufacturing
Combined Heat & Power (CHP) systems

FAQ

How long does it normally take to get a gas turbine generator?

Industry lead times for gas-fired turbine generators can run into years. FlexEnergy’s current production window allows qualified projects to bypass that wait and move into accelerated deployment.

Who qualifies for immediate gas turbine availability?

Qualified projects typically include 250 kW to 2 MW power needs, mission-critical applications, emissions-sensitive sites, and time-sensitive deployments in oil and gas, midstream, CHP, manufacturing, and data center environments.

How much gas turbine capacity is currently available?

FlexEnergy currently has 10 MW of total generating capacity available now, made up of Flex Turbine® units ranging from 250 kW to 2 MW.

Are Flex Turbine generators CARB compliant?

Yes. The Flex Turbine is certified by the California Air Resources Board for installation and use in California.

Secure Capacity Before Lead Times Stretch Again

Whether you’re expanding an existing site or launching a new one — this is your chance to move faster than the market.

Secure Your Gas Turbine Power Generation Now →