FlexEnergy’s expanded manufacturing capacity and improved fleet management have opened limited availability for Flex Turbine® units. Qualified projects can move toward deployment now instead of waiting through extended industry lead times.
Across the industry, gas turbine wait times now stretch into years. FlexEnergy Solutions has opened a limited capacity for qualified projects to access Flex Turbine generating capacity sooner, helping teams move forward now instead of waiting for future production slots.
How soon can I secure a Flex Turbine?
Flex Turbine units are available now for immediate deployment supporting qualified projects from 250 kW to 2 MW — limited availability that will close as units are claimed by new orders.
Faster access to gas turbine
power generation
Accelerated project timelines
The ability to move forward while
others wait
This window is temporary. Once available units are committed to new orders,
delivery schedules will extend and lead times will rise again.
Flex Turbine® gas microturbine gensets are built for:
FlexEnergy currently has 10 MW of total generating capacity available, made up of Flex Turbine® units ranging from 250 kW to 2 MW. To maximize production efficiency, we’re prioritizing:
The Flex Turbine fleet has demonstrated 99+% mechanical availability, backed by over 4 million runtime hours
Flex Turbines deliver ultra-low emissions, typically lower than the local utility grid
Wide fuel tolerance provides fuel flexibility (well gas, flare gas, sour gas)
Our Flex Grid microgrids can scale from 200kW to ~10 megawatts as needed
The Flex Turbine is certified by the California Air Resources Board (CARB) for installation and use in California
In today’s market:
With this opportunity:
This production window exists because improved fleet management freed up underutilized assets and we just completed our production line expansion.
When these units are deployed and incoming orders are scheduled…
Capacity will tighten again
Production schedules will extend
Lead times will increase
This is a short-term opportunity, not a permanent change.
Tell us your project size, application, and timeline and we will confirm whether your project qualifies for fast-track deployment.
FlexEnergy Solutions delivers reliable, clean turbine generated power for:
Industry lead times for gas-fired turbine generators can run into years. FlexEnergy’s current production window allows qualified projects to bypass that wait and move into accelerated deployment.
Qualified projects typically include 250 kW to 2 MW power needs, mission-critical applications, emissions-sensitive sites, and time-sensitive deployments in oil and gas, midstream, CHP, manufacturing, and data center environments.
FlexEnergy currently has 10 MW of total generating capacity available now, made up of Flex Turbine® units ranging from 250 kW to 2 MW.
Yes. The Flex Turbine is certified by the California Air Resources Board for installation and use in California.
Whether you’re expanding an existing site or launching a new one — this is your chance to move faster than the market.